Outside the home
Recent work

BeforeAfterQuestions
Not when done properly. We use a surface cleaner at the right pressure for the material. Soft limestone is done at lower pressure.
A standard double driveway is usually two to three hours including edges.
No, as long as we can reach the area and a tap. We send photos when it is done.
Yes. Re-sanding the joints after the clean is a common add-on.
Related